Course Setting: Difference between revisions

513 bytes added ,  08:18, 22 April 2017
no edit summary
(Created page with "OCAD Ver.8 text, IOF standard XML files and simple 'Course.csv' are acceptable. Please create a file and drop to 'Event Manager' to import. File:course-define-1.png|thumb|n...")
 
No edit summary
Line 13: Line 13:
[[File:course-define-4.png|thumb|none|upright=1.5|Click button to configure start and finish.]]
[[File:course-define-4.png|thumb|none|upright=1.5|Click button to configure start and finish.]]
[[File:course-define-5.png|thumb|none|upright=1.5|Click button to configure start and finish.]]
[[File:course-define-5.png|thumb|none|upright=1.5|Click button to configure start and finish.]]
* If runners finish by punching finish station, fill 'F' into text box (for SPORTident) or unit code (for emit).
* If runners finish by punching finish station, fill 'F' into text box (for SPORTident) or unit code (for emit). In other case, you must input finish time for each finish manually or use photo-cell.
In other case, you must input finish time for each finish manually or use photo-cell.
 
== Course details ==
* Double click a line to define details.
[[File:course-define-6.png|upright=1.5|thumb|none|Details]]
<br />
; Visiting order
* Select 'Specific order' for normal event.
* If competitors can check controls in any order, select 'No specific order'. (Competitor must check all controls. Otherwise the competitor is disqualified.)
; Format of control code
* If multiple codes of station are used at one control, describe them with '/' separator.
<br/>
----
[[Basic Usage|[Back to Basic Usage]]]