Basic Usage: Difference between revisions

From Mulka2
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
== Flow of operation ==
== Flow of operation ==
* Before the race
* Before the race
** Make an event data
** Create an event data
** Input participants data
** Input participants data
** Input courses data  
** Input courses data  
Line 20: Line 20:
For score-o event, it is necessary to input score for each controls instead of course data.
For score-o event, it is necessary to input score for each controls instead of course data.


* [[Make a New Event Data]]
* [[Create a New Event Data]]
* [[Input Start List]]
* [[Input Start List]]
* [[Class Setting]]
* [[Class Setting]]

Revision as of 02:31, 22 April 2017

Flow of operation

  • Before the race
    • Create an event data
    • Input participants data
    • Input courses data
  • The race day
    • Input direct entries
    • Download runners’ card data
    • Print results
  • After the race
    • Publish results to website

Before the race

In standard event, make a new event data by using 'Event Manager'.

For standard foot-o event, it is necessary to input start list and course data. If you input participant data on event day by using ’Direct Entry' feature, it is necessary to define classes instead of inputting start list.

For score-o event, it is necessary to input score for each controls instead of course data.